Ørsted has assessed how the wind farm could affect marine mammals in Manx waters and internationally. The assessments follow industry best practice and guidance and use modelling to predict underwater noise levels. Further assessment of effects in Manx waters was informed by advice from an independent marine mammal adviser, jointly appointed by Ørsted and the Department of Environment, Food and Agriculture (DEFA).
Ørsted has set out an approach to managing and monitoring underwater noise during foundation piling and the clearance of unexploded ordnance.
If consent is granted, the final design and construction equipment, including piling hammers and vessels, will be selected before construction, within the limits assessed for the project. Equipment choices will reflect what is available at that time. Further seabed surveys and detailed modelling of ground conditions will inform updated noise predictions. These will determine whether noise-reduction measures are needed and which measures should be used. Ørsted has not committed to specific noise-reduction measures at this stage.
There are typically several years between consent and construction, and technology can improve during that time. The final approach should therefore allow newer noise-reduction technologies to be considered, rather than only those available when the application was submitted. Any new measures must stay within the project's assessed design limits and must not create effects outside those assessed.
At the request of the Joint Nature Conservation Committee (JNCC), Ørsted carried out further modelling. This showed that currently available noise-reduction systems have the potential to reduce significant underwater noise effects from piling, even under the maximum-impact design assessed. This modelling also informed the assessment for Manx waters. The final noise-management approach will take account of changes to legislation and industry guidance and allow newer noise-reduction systems to be selected if modelling shows they are needed.
Ørsted considers that it has shown significant effects can be reduced within the maximum-impact design assessed. However, DEFA remains concerned about effects on marine mammals, particularly in the absence of Manx-specific assessment guidance. In response, Ørsted has proposed an approach to monitoring dolphins as part of its wider biodiversity work.